Google fleet-wide CDU availability since 2020 (redundant pump+HX, UPS-backed)

~99.999%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeVendor-reported availability of Google's own liquid-cooled TPU CDU fleet (Project Deschutes architecture, redundant pump and heat exchanger, UPS-backed) since 2020, across more than 2,000 TPU Pods. Google states neither the availability definition, the excluded-event list nor the measurement method, and the figure is not independently audited; it is not a rating for a purchased CDU and does not transfer to a non-redundant or non-UPS-backed installation.
As of2025-04
SourceGoogle Cloud (Project Deschutes, OCP EMEA)
Reviewchecking…review by 2026-09-16 · standard cadence
Recorded changeslast 2026-09-16 · 2 revisions tracked
Claim idgoogle-fleet-wide-cdu-availability-since-2020