Lenovo NVIDIA GB300 NVL72 rack: nominal TDP and workload-dependent peak

135 kW nominal TDP / up to 155 kW peakobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeOne named Lenovo product record. These are distinct operating quantities, not a single scalar or a project electrical design rating.
CaveatTest the purchased configuration and its transient behaviour against Lenovo's electrical design requirements. NVIDIA's reference-architecture figure of up to 142 kW is a separate number, not a Lenovo design provision.
As of2026-08
SourceLenovo Press LP2357 product guide, updated 2026-08-30. · Key features: rack power and air/liquid heat capture; 135 kW TDP, up to 155 kW peak depending on workload and EDP behavior.
Reviewchecking…review by 2026-12-05 · standard cadence
Recorded changeslast 2026-09-16 · 4 revisions tracked
Claim idgb200-gb300-nvl72-rack-tdp-gb300-up-to-142-kw