The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

OCP MGX Rack & Trays Rev. 1.1 reference cooling profile (not an HPE GB200 NVL72 product record)

120 kW rack, ~85% liquid capture (~102 kW liquid / ~18 kW air), target sustained flow up to 130 L/min, ~10 psid node ΔP at target flow, 5 bar(g) max operating / 15 bar(g) min burst, 25/50 µm filtrationobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
Scope{"category":"Cooling & water","scenario":"OCP MGX reference rack (NVIDIA contribution) — do not mix with the HPE profile"}
CaveatKeep this 120 kW / 102 kW liquid / 18 kW air OCP reference profile separate from HPE's 132 kW / 115 kW liquid / 17 kW air record.
As of2025
SourceOCP MGX Rack & Trays Specification Rev. 1.1
Reviewchecking…review by 2026-09-23 · standard cadence
Recorded changeslast 2026-07-13
Claim idgb200-nvl72-rack-cooling-profile-ocp-mgx-rack-re

Where the guide uses it

Not quoted in a chapter yet; it is kept in the curated register.

← Full numbers register — every date-stamped figure in the guide, with revision history.