HPE GB200 NVL72 fully loaded mass with PGW; obtain a separate shipping/rigging inventory
3,245 lb (about 1.47 t) fully loaded with PGWobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | One HPE GB200 configuration, not GB300 or a generic NVL72 shipping mass. Guide unit conversion uses 0.45359237 kg/lb; about 1.47 t. Packaging, shipping state and foot/wheel/rigging reactions require the selected OEM inventory. |
| As of | 2026 |
| Source | HPE — NVIDIA GB200 NVL72 QuickSpecs, System Unit Specifications. · System Unit Specifications: Weight (approximate), Fully Loaded (with PGW): 3245 lbs. |
| Review | checking…review by 2026-07-27 · standard cadence |
| Recorded changes | last 2026-09-16 · 2 revisions tracked |
| Claim id | gb200-gb300-nvl72-shipping-weight-3-000-lb-in-a |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.