fully-built cost of a gigawatt-scale AI campus incl. IT (all-in ~$30/W; Epoch models ~$38B of up-front capex for a stylized 1 GW-IT US hyperscaler campus, plus ~$0.9B/yr opex)

~$30–40Bobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatThe ~$38B is Epoch's UP-FRONT CAPEX for a stylized 1 GW-IT campus (May-2026 CSV: servers 21.2 + facility 11.4 + network 4.9 + land 0.17 + utility 0.16 = $37.9B). Financing is not included; land is, at a trivial $172M — correcting an earlier note here that placed land in opex. Epoch's annualized TCO for the same campus is ~$8.5B/yr.
As of2026
Sourcecross-ref: Ch 6.3 (McKinsey ~$30/W) / Ch 1.8 (Epoch AI ~$38B) · Opening summary: typical 1 GW AI data center requires $38B in up-front CapEx
Reviewchecking…review by 2026-09-29 · fast cadence
Recorded changeslast 2026-07-07
Claim idfully-built-cost-of-a-gigawatt-scale-ai-campus