Vertiv CoolCenter fully loaded tank mass; the manual separately reports footprint-average bearing pressure without support frames

1,732–2,095 kg loadedobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeThe manual's 1,679–1,721 kg/m² values are footprint-average screening pressures, not support-frame or leg reactions. Structural acceptance requires the actual support reactions, move/installation loads, load combinations, and like-for-like floor-system criteria.
As of2025
SourceVertiv · Table 4.5: fully loaded tank mass and footprint-average bearing pressure without support frames
Reviewchecking…review by 2026-10-03 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idflooded-tank-point-load-can-exceed-800-kg-m