fleet PTP offset-from-master target the time-sync gate must demonstrate, under load and across every node
sub-µsobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Meta's February 2024 SPTP report gives fleet offset-from-master distributions for more than 100,000 clients, with the sub-microsecond values presented graphically. Treat it as the target the acceptance sweep must demonstrate on your own fleet, under load and across every node, not as a standards threshold. |
| As of | 2024 |
| Source | Engineering at Meta · “SPTP’s performance,” Figures 5–6; fleet offset distributions are reported for more than 100,000 SPTP clients, but the sub-microsecond values are primarily presented graphically. |
| Review | checking…review by 2026-09-20 · fast cadence |
| Recorded changes | last 2026-08-24 · 3 revisions tracked |
| Claim id | fleet-ptp-offset-from-master-target-the-time |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.