The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

EU PED 2014/68/EU applies to pressure equipment and assemblies with maximum allowable pressure PS > 0.5 bar; pressure equipment is classified into hazard Categories I-IV, while assemblies receive global conformity assessment based on constituent equipment/highest applicable category

PS > 0.5 bar; pressure-equipment Categories I-IV; assemblies global conformity assessmentobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2026-05-30 consolidated
SourcePressure Equipment Directive 2014/68/EU · Article 1(1) Scope; Article 13(1) classification of pressure equipment; Article 14(2) Categories I-IV; Article 14(6)(a)-(b) global conformity assessment of assemblies
Reviewchecking…review by 2026-12-22 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim ideu-ped-2014-68-eu-applicability-threshold

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.