ERCOT Large Load site threshold; "Large Electronic Load" = ≥50% power-electronic computational demand (NOGRR 282 / NPRR 1308)
≥75 MW / ≥50%observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2025 |
| Source | ERCOT NOGRR 282 / NPRR 1308 (filed Nov 2025) · Key Documents, NPRR1308 revision materials associated with NOGRR282; the issue page is the canonical ERCOT publication, but the linked filing could not be loaded to independently confirm both numerical thresholds |
| Review | checking…review by 2026-11-23 · standard cadence |
| Recorded changes | last 2026-07-02 · 2 revisions tracked |
| Claim id | ercot-large-load-site-threshold-large |