The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

EN 50600 / ISO/IEC 22237 infrastructure classification families; use the specific applicable parts and editions

Class 1–4observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeAvailability/protection frameworks; not automatic equivalents of TIA Rated levels or Uptime Tiers. EU reporting requirements are specified separately in the applicable legislation.
As of2021-10-05
SourceCENELEC EN 50600 and ISO/IEC 22237 infrastructure families. ISO/IEC 22237-1:2021 catalogue scope; individual parts govern distinct infrastructure and management requirements. · ISO catalogue: Abstract and life-cycle stage 60.60 dated 2021-10-05; that date belongs to ISO/IEC 22237-1 only, not the whole EN family.
Reviewchecking…review by 2027-04-18 · slow cadence
Recorded changeslast 2026-09-16 · 2 revisions tracked
Claim iden-50600-iso-iec-22237-availability-classes

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.