embodied-carbon reduction achievable on the concrete mix via low-clinker / SCM / CO2-mineralized concrete

up to ~50%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
Scopeconcrete embodied carbon
As of2025
SourceMicrosoft Cloud blog; Carbon Direct · Low-carbon concrete section; Washington pilot mixes can lower embodied carbon by more than 50% versus traditional mixes
Reviewchecking…review by 2026-07-30 · standard cadence
Recorded changeslast 2026-06-29
Claim idembodied-carbon-reduction-achievable-on-the