DLC flow rule of thumb (PG25); ~7.5–12 °C coolant delta-T target across the TCS
~1.25–2.0 L/min/kWrecommendation
| Value kind | recommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions. |
|---|---|
| As of | 2025 |
| Source | Dober |
| Review | checking…review by 2026-11-08 · standard cadence |
| Recorded changes | last 2026-08-24 · 7 revisions tracked |
| Claim id | dlc-flow-rule-of-thumb-pg25-7-5-12-c-coolant |
Where the guide uses it
- 5.11 Thermal Design, Reliability, Leak Detection & Commissioning
- 5.13 Facility Piping & Pressure-System Mechanical Engineering