direct-to-chip system capex vs ~$1,000+/kW for immersion
$300–500/kWobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2026 |
| Source | DCD / IDTechEx / Signal Integrity Journal |
| Review | checking…review by 2026-09-19 · fast cadence |
| Recorded changes | last 2026-08-24 · 6 revisions tracked |
| Claim id | direct-to-chip-system-capex-vs-1-000-kw-for |
Where the guide uses it
- 5.4 Direct-to-Chip Liquid Cooling (DLC) — Architecture, Fluid & Thermal Design
- 5.13 Facility Piping & Pressure-System Mechanical Engineering
← Full numbers register — every date-stamped figure in the guide, with revision history.