per dense training rack: HPE GB200 NVL72 132 kW nominal TDP; GB300 NVL72 up to 142 kW per full rack (NVIDIA reference architecture)

132 kW HPE GB200 nominal TDP / up to 142 kW GB300 full rack (NVIDIA)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatThese are rack power bases from HPE (GB200 NVL72, nominal TDP) and NVIDIA (GB300 NVL72, full-rack requirement in its reference architecture). Other GB300 OEM profiles run higher at peak, so size power to the configuration you buy. The figures say how much power the rack draws, not which cooling path it needs.
As ofHPE V6 2026-09-08; NVIDIA RA accessed 2026-10-05
SourceHPE GB200 NVL72 QuickSpecs V6, 2026-09-08; NVIDIA GB300 NVL72 Enterprise Reference Architecture, System Hardware & Components (https://docs.nvidia.com/enterprise-reference-architectures/nvl72-ai-factory/latest/components.html), accessed 2026-10-05 · HPE: Power Delivery and Requirements, 132 kW nominal TDP; NVIDIA: full GB300 rack requiring up to 142 kW
Reviewchecking…review by 2027-04-01 · standard cadence
Recorded changeslast 2026-10-14 · 5 revisions tracked
Claim idper-dense-training-rack-gb200-nvl72-120-132-kw