200 MW / 275 kV transmission-connected grid-forming BESS delivering inertia and short-circuit stability services (Zenobē Blackhillock Phase 1, NESO Stability Pathfinder); transmission-level BESS black start not yet demonstrated
200 MW / 275 kVobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | A separate live trial demonstrated a grid-forming BESS acting as an island anchor at 8 MW, including energization of a 132 kV line and associated transformers; that trial should be cited if the intended claim is demonstrated black-start capability. |
| As of | 2025 |
| Source | Zenobē Blackhillock Phase 1 launch; NESO Distributed ReStart for distribution-scale black start · Project description and listed grid-forming services |
| Review | checking…review by 2026-08-25 · fast cadence |
| Recorded changes | last 2026-07-17 · 4 revisions tracked |
| Claim id | demonstrated-grid-forming-bess-black-start |