The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

ibdiagnet v2.13.0 legacy --ber_test default threshold

1e-12observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeThe 10^-12 default belongs to --ber_test for SwitchX, ConnectX-4 and ConnectX-3. The manual directs later devices to --get_phy_info; qualify BER/FEC fields and limits under the installed interface profile in Chapter 13.7.
As of2023-11
SourceNVIDIA, ibdiagnet InfiniBand Fabric Diagnostic Tool User Manual v2.13.0, PDF exported November 20, 2023. · PDF page 7, Basic Commands, --ber_test and --ber_thresh
Reviewchecking…review by 2027-03-08 · standard cadence
Recorded changeslast 2026-09-16 · 2 revisions tracked
Claim iddefault-fabric-ber-acceptance-threshold-per

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.