OCP Diablo 400 v0.7.0 §8.2.1: optional two-wire 800 VDC output, safety-isolated from protective earth (alongside the bipolar ±400 V midpoint-bonded option)

800 VDC two-wire (optional; isolated from PE)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeOptional two-wire output isolation requirement only; the ±400 V midpoint-bonding fact and the solid/HRG detector conflict have separate records.
As of2026-03-01
SourceOCP Diablo 400 v0.7.0, March 1, 2026 · §8.2.1, p.22: optional two-wire output isolation from PE.
Reviewchecking…review by 2027-03-05 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim iddc-bus-voltages-replacing-the-grounded-415-480