CPO power efficiency gain vs pluggable optics (NVIDIA silicon photonics; ≈70% optical-interconnect power cut, Broadcom Davisson)
~3.5xobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Caveat | Vendor comparisons on different measurement boundaries, not interchangeable installed-system guarantees: ~3.5× is NVIDIA's March 2025 silicon-photonics claim against pluggable optics; the ≈70% lower optical-interconnect power is Broadcom's separate October 2025 Davisson claim. |
| As of | 2025–2026 |
| Source | NVIDIA Newsroom / Broadcom (Tomahawk 6 Davisson) |
| Review | checking…review by 2026-08-11 · standard cadence |
| Recorded changes | last 2026-06-29 |
| Claim id | cpo-power-efficiency-gain-vs-pluggable-optics |