cooling-energy reduction from DeepMind RL control (≈15% PUE-overhead reduction); sensors read every 5 min
~40%observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | DeepMind RL cooling savings |
| As of | 2016 (autonomous control 2018) |
| Source | DeepMind / Google · Results section: 40% cooling-energy reduction, equivalent to a 15% reduction in overall PUE overhead |
| Review | checking…review by 2026-11-23 · standard cadence |
| Recorded changes | last 2026-06-29 |
| Claim id | cooling-energy-reduction-from-deepmind-rl |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.