Sustained payload bandwidth to copy an assumed 100 TB decimal in one hour

about 220 Gbit/s payloadderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeBulk-copy completion window, not a one-hour-RPO guarantee. Network line rate and actual inter-region transfer price require the selected path and service.
As of2026-09
SourceAWS supplies recovery-pattern boundaries only. Guide unit conversion from an assumed 100 TB decimal copy and one-hour window; no tariff or measured path performance. · Chapter 12.3 recovery-point and transfer boundary
Derivation100 × 10^12 bytes × 8 / 3600 seconds / 10^9 = 222.2222 Gbit/s. Rate excludes protocol/replication overhead. RPO additionally depends on captured state age, durable commit and the surviving failure domain.
Reviewchecking…review by 2027-09-05 · fast cadence
Recorded changeslast 2026-09-16 · 6 revisions tracked
Claim idcontinuous-replication-bandwidth-200-gbps-to