The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

ConnectX-8 SuperNIC Ethernet port structure: the single 800 Gb/s physical port runs Ethernet as 2x400GbE — a single 800GbE link is unsupported — while the same port carries 800 Gb/s XDR InfiniBand; the substrate of dual-plane back-end designs

2x400GbEobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatPer the official supported-speeds lists (Ethernet max 400GbE per logical link; XDR InfiniBand 800G) and NVIDIA's port-link-type documentation stating a single 800GbE link is unsupported; the B300 reference architecture deploys it as 2x400GbE into two planes.
As of2026-08
SourceNVIDIA
Reviewchecking…review by 2026-09-05 · fast cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idconnectx-8-ethernet-port-structure

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.