ProphetStor-reported CDU energy saving in its Proven Benefits discussion

22–28%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeThe reported range belongs to the supplier’s Proven Benefits discussion; it is not established as the result of the separate twenty-job, single-server integration test.
CaveatA vendor-reported result at its stated boundary; compare matched useful output and facility energy before selecting predictive supervision.
As of2026
SourceProphetStor, Predictive Liquid Cooling for AI Data Centers, Proven Benefits discussion (undated supplier page). · Proven Benefits: 22–28% lower CDU energy versus fixed flow; separate integration-test setup and manually applied recommendations
Reviewchecking…review by 2026-09-16 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim idcdu-energy-saved-by-predictive-control-while