Ohm's-law screening current at an assumed 1,000 ohm body resistance: about 800 mA at 800 VDC versus about 48 mA at 48 VDC; injury depends on path, duration and actual contact impedance

≈800 mAderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeIllustrative Ohm’s-law arithmetic at an assumed 1,000 Ω; potentially fatal exposure, not a prediction of current through a person, an injury threshold, a DC arc model or permission for exposed work. The source’s protective-grounding context does not become a rack-maintenance procedure.
As of2026-08-24
SourceU.S. Occupational Safety and Health Administration, 29 CFR 1926 Subpart V Appendix C, 2025 CFR edition, III.D.1, printed p. 509; GovInfo final text read September 8, 2026. · Appendix C, III.D.1, printed p. 509: assumed body resistance and impedance variability
DerivationGuide derivation: I=V/R at an illustrative 1,000 ohm resistance gives 800 mA and 48 mA. Actual current and harm vary with contact impedance, path and duration.
Reviewchecking…review by 2026-12-22 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim idbody-current-from-800-vdc-contact-1-000