Guide footprint-average screening range for 3,000–3,300 lb over approximately 0.64 m²
~435-480 psfderived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | The class-mass endpoints are screening assumptions, not HPE minimum and maximum ratings. HPE GB200 provides the separate named 3,245 lb profile. Neither result is a support, rolling or uniform floor rating. |
| As of | 2026-07 |
| Source | HPE GB200 QuickSpecs V5, July 20, 2026: system dimensions and loaded-with-fluid mass; the guide range uses the stated class-mass screening assumptions. · System Unit Specifications; named OEM example within the declared screening range |
| Derivation | 3,000–3,300 lb divided by approximately 0.64 m² / 0.09290304 m² per ft² gives approximately 435–480 psf. Footprint area is not allocated structural-bay area. |
| Review | checking…review by 2027-03-08 · standard cadence |
| Recorded changes | last 2026-09-16 · 4 revisions tracked |
| Claim id | back-calculated-nvl72-footprint-loading-3-000-3 |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.