active RDHx capacity per rack — Motivair ChilledDoor is rated up to 75 kW with 100% heat removal
up to 75 kW — Motivair ChilledDoorobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Caveat | Rated at 30 °C inlet water, 23 gpm and 35 °C server supply air. At a cooler room setpoint the same door carries less, so ask for the rating at your own air and water temperatures. |
| As of | 2026-09 |
| Source | Motivair ChilledDoor product page; HPE QuickSpecs, Motivair Liquid Cooled Doors (V4, 2022-04-04) for the rating condition · HPE QuickSpecs: 'support IT loads up to 75 KW at 30°C inlet water with 23 gallons per minute (GPM) and a server supply air temperature of 35°C' |
| Review | checking…review by 2027-03-29 · fast cadence |
| Recorded changes | last 2026-10-05 · 6 revisions tracked |
| Claim id | active-rdhx-capacity-per-rack-newest-high |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.