in-row cooler capacity per cooling unit (Liebert CRV CR032–CR050); kW per rack depends on unit-to-rack ratio, containment and air conditions

~30–50 kWobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeVertiv publishes these as per-unit cooling capacities (CR032/CR035/CR040/CR050). Converting them into kW per rack requires the number of units serving the row, airflow distribution, containment, entering-air conditions and the redundancy case. The figure does not establish an equivalent close-coupled fan-wall rating.
As of2025
SourceVertiv · Model Specifications Overview; CR032, CR035, CR040 and CR050 models provide 32–50 kW
Reviewchecking…review by 2026-10-27 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idactive-in-row-cooler-capacity-per-rack