accelerator-utilization threshold for a passing MLPerf Storage result (70% for Cosmoflow); holding this line is the loader's core objective
≥90%observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2025-08 |
| Source | MLCommons, MLPerf Storage v2.0 · Throughput metric definition: maximum performance while maintaining accelerator utilization at 90% or above |
| Review | checking…review by 2026-09-21 · standard cadence |
| Recorded changes | last 2026-07-07 · 2 revisions tracked |
| Claim id | accelerator-utilization-threshold-for-a-passing |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.