accelerated GPU economic life — contested: bear case 2–3 yr on obsolescence; Goldman Sachs estimates 4–6 yr useful life vs 5–6 yr book

2–3 yr (bear case) vs 4–6 yr (GS)forecastcontested

Value kindforecast — Forecasts are time-bound outlooks, not specifications; test decisions across plausible scenarios.
ScopeGoldman Sachs characterizes four to six years as the estimated useful life of AI accelerators; it does not substantiate a general two-to-three-year economic life or a universal 20–40% three-year residual value.
As of2026
SourceGoldman Sachs Global Institute, Tracking Trillions (April 2026), for the 4–6 yr useful life; Michael Burry (November 2025, reported by CNBC 2025-11-11) for the 2–3 yr bear case · Assumption 1: The Economic Useful Life of AI Chips
Reviewchecking…review by 2027-03-01 · fast cadence
Recorded changeslast 2026-10-05 · 5 revisions tracked
Claim idaccelerated-economic-life-vs-5-6-yr-book-life