Check your understanding: Networking, Fabrics & Optics

10 questions from Part 8 of the guide. Score instantly; every explanation links to the chapter that derives the answer.

  1. In a synchronous AI cluster, the guide argues the network is best understood as…
  2. Scale-up vs scale-out: what distinguishes the scale-up domain?
  3. How does the GB200 NVL72 GPU domain differ from NVIDIA’s future NVLink XPU roadmap?
  4. Two vendors quote collective-fabric efficiency percentages. What must be normalized before the numbers can be compared?
  5. The Ultra Ethernet Consortium (UEC) matters because…
  6. What is the gating spec when choosing switch silicon, according to the guide?
  7. Shallow-buffer vs deep-buffer switch ASICs: which pairing is right?
  8. What evidence should set a back-end fabric's oversubscription ratio?
  9. A two-tier fat-tree on 144×800G radix switches scales to roughly how many GPUs?
  10. Moving from a congested to a well-engineered fabric does what to GPU idle time, per the guide's figure?