The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Warm-water loop

Warm-water loop

A liquid-cooling loop run at elevated temperature so heat can be rejected with free cooling and reused downstream.

← All terms