UCCM
The congestion-control mechanism in the Ultra Ethernet transport, paired with packet trimming so loss becomes a fast signal rather than a stall on a sprayed multipath fabric.
Current numbers
2025-06-11Ultra Ethernet Consortium UEC Specification 1.0 released (UET transport, packet spray, UCCM, packet trimming, native RDMA)