The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › TSV

TSV · Through-Silicon Via

A vertical electrical channel drilled through a die to stack chips, the wiring that makes HBM and 3D stacking possible.

← All terms