The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › ToR

ToR · Top-of-Rack

The switch installed in each rack that aggregates that rack's server links before the leaf and spine layers; also shorthand for that whole layer of the topology.

Also written as: ToR switch · Top-of-Rack

← All terms