TFLOPS · trillion floating-point operations per second
The throughput ladder for accelerators, rising through PFLOPS and EFLOPS; always read alongside the precision and sparsity assumptions, because the headline figure quotes the most favorable ones.
Also written as: PFLOPS · EFLOPS · ExaFLOPS
Current numbers
192 GBHBM3E per Ironwood (TPU v7) chip @ 7.37 TB/s; 4,614 FP8 TFLOPS; 6x memory vs Trillium
192 GB / 7.4 TB/sHBM3E per Ironwood TPU v7 (inference-era ASIC); 9,216-chip pods, 42.5 FP8 ExaFLOPS, 4,614 FP8 TFLOPS/chip