The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › SXID

SXID

An NVSwitch error event reported by the NVIDIA driver, the switch-side counterpart of a GPU XID. Triage reads it with the linked GPU events before draining a node or tray.

← All terms