STATCOM · Static Synchronous Compensator
An inverter-based device that injects or absorbs reactive power within milliseconds to hold voltage at a bus or the point of interconnection. It responds faster than switched capacitor banks.
An inverter-based device that injects or absorbs reactive power within milliseconds to hold voltage at a bus or the point of interconnection. It responds faster than switched capacitor banks.