The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › SIS

SIS · Safety-instrumented system

An instrumented protection system designed to drive a process to a safe state and meet a specified safety-integrity requirement. Architecture may be hardwired or programmable; independence, override/bypass controls, diagnostics, proof testing, and lifecycle governance are design-specific, not universal.

← All terms