The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › SCADA

SCADA · Supervisory Control and Data Acquisition

Industrial control software that monitors and operates a facility's physical systems like power and cooling.

Current numbers

~2.9 PBper SCADA-class flash server: 96 liquid-cooled E3.S drives on PCIe 6.0 (GPU-initiated I/O)as of 2026 · register ↗

← All terms