The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › PLC

PLC · Programmable logic controller

The industrial controller executing chiller, CDU, and switchgear I/O beneath the BMS and EPMS; it usually speaks unauthenticated protocols, which makes it prime OT attack surface.

← All terms