NRE · Non-Recurring Engineering
The one-time design cost of a custom chip or system, absorbed up front for a lower cost per unit — and unrecoverable if the volume never arrives.
The one-time design cost of a custom chip or system, absorbed up front for a lower cost per unit — and unrecoverable if the volume never arrives.