The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › NPSH

NPSH · Net positive suction head

The suction-side pressure margin a pump needs to avoid cavitation; available must beat required at the worst-case low-pressure node in every redundancy state.

← All terms