The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › NERC CIP

NERC CIP · Critical Infrastructure Protection

The mandatory, audited cyber and physical security standards for bulk-electric-system assets, which reach a campus through its interconnection and any grid-facing equipment it owns.

← All terms