Guide › Glossary › MV

MV · Medium voltage

The utility-to-facility distribution voltage class feeding site transformers and switchgear; the level where lead times, arc-flash energy, and gear cost step up sharply.

Current numbers

NEC 2029 (partial, forecast); UL certification pathway openNEC 2029 expected to add partial 800 VDC provisions (SemiAnalysis); UL opened an MV SST certification program in September 2026as of 2026-10-19 · register ↗
4 → 3 functional blocksillustrative AC → integrated MV/DC functional-block count, including final DC conversionas of 2026-09 · register ↗
About 80–87% AC case (82% representative)Chapter 4.1's assumed AC conversion chain, MV input to core-regulator output; upstream HV/MV transformation, distribution and auxiliary losses excludedas of 2026-09-08 · register ↗