The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › LV

LV · Low voltage

The sub-kilovolt class of final distribution boards, PDUs, and server inputs, where conductor sizing, fault current, and copper cost dominate the design.

Current numbers

230 / 400 VIEC LV utilization (1φ / 3φ) vs ANSI 120/208 V or 277/480 Vas of standard · register ↗

← All terms