The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › LPS

LPS · Lightning protection system

The air terminals, down conductors, and low-impedance earth connection on the building envelope that give a strike a path around the electronics rather than through them.

Current numbers

IEC 62305international lightning-protection standard (risk, LPS, SPM, services); NFPA 780 is the NA counterpartas of 2024 · register ↗

← All terms