The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › LoRA

LoRA · Low-Rank Adaptation

A fine-tuning method that trains small low-rank adapter matrices instead of all weights, slashing cost and memory.

Current numbers

~0.003–0.022%Share of GPT-3 parameters trained in the original LoRA paper's two Table 4 configurationsas of 2021-10-16 · register ↗

← All terms