L2A · Liquid-to-air

Trade shorthand for a closed-loop cold-plate system rejecting heat into the existing air plant: the drop-in retrofit path, bought at the price of a hard density ceiling.

Current numbers

~60 kW/rackGoogle Brazos liquid-to-air sidecar, nominal rack thermal load (OCP specification v0.75.4); no facility-water re-plumbas of Google 2026-06-16; OCP spec v0.75.4 effective 2026-09-11 · register ↗