Kubernetes · K8s
The dominant open-source container orchestration platform, increasingly used to schedule AI inference and training.
Current numbers
1 / node (driver-managed IMEX)Kubernetes DRA driver allows one ComputeDomain per node, so a second domain cannot use that node's leftover GPUs
K8s 1.32+Standalone DRA driver path for ComputeDomains needs Kubernetes 1.32+, with the DRA feature gate enabled on 1.32 and 1.33
~70% / ~20% / ~10%AI/HPC scheduler share: Slurm / Kubernetes / in-house (rule of thumb)