The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › FRU

FRU · Field-Replaceable Unit

A component designed to be swapped on-site, such as a power supply, fan or drive, without sending the whole system back.

Current numbers

102.4 Tb/s; Davisson early-access sampling announcedDavisson original CPO announcement; procurement and engine FRU evidence remain product-specificas of 2025-10-08 · register ↗
20% → 5%Delta modeled recovery/availability scenario; not a measured stocked-FRU interventionas of 2025 · register ↗

← All terms