The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Fork

Fork

A point where a design or program path splits into mutually exclusive options that must be chosen between.

Current numbers

5,184in-rack copper NVLink cables in an NVL72 — the copper-mass reality that drives the busbar-cooling forkas of 2025 · register ↗

← All terms